Most HOAs require homeowners to get approval before making visible exterior changes to their property — a new fence, a repaint, a deck, landscaping changes, or a new roof. This process usually runs through an Architectural Review Committee (ARC), sometimes called a Design Review Committee or Modifications Committee, a small group (often board members or dedicated volunteers) that reviews requests against the community's design guidelines.
What typically requires approval
- Exterior paint colors or siding changes
- Fences, walls, and gates
- Decks, patios, and pergolas
- Roofing material or color changes
- Landscaping changes visible from the street (major hardscaping, tree removal)
- Exterior lighting, solar panels, and satellite dishes
- Window and door replacements that change the exterior appearance
Interior changes almost never require ARC approval — the review process is specifically about anything visible from outside the home that could affect the community's overall look.
How the process usually works
- Submit an application — typically a form describing the project, plus supporting materials like photos, contractor plans, material samples, or paint swatches.
- Committee review — the ARC evaluates the request against the community's written design guidelines, not personal preference (though in practice, subjectivity does creep in).
- Decision within a set timeframe — many governing documents specify a response window (commonly 30-45 days); if the ARC doesn't respond in time, some states or governing documents treat that as automatic approval, though this varies.
- Written approval or denial — you should always get the decision in writing, and if denied, a reason. Save this regardless of outcome.
Common reasons projects get rejected
- Color or material doesn't match the approved palette in the design guidelines
- Incomplete application — missing plans, dimensions, or material specs
- Project doesn't meet setback or height requirements
- Precedent concerns — the ARC worries approving one request will force them to approve similar future ones they don't want
How to improve your odds
- Read the actual design guidelines before applying, not just the CC&Rs — most associations have a separate, more detailed architectural standards document.
- Submit complete applications the first time — photos, measurements, material/color samples, contractor info.
- Talk informally with the management company or a board member beforehand if you're unsure — many committees are happy to give informal guidance before a formal submission.
- Never start work before written approval, even if you're confident it'll be approved — this is one of the most common (and expensive) mistakes, since associations can require you to undo unapproved work at your own cost.